Production Planning and Control
Production Planning and Control covers materials and capacity planning, MRP systems, and SAP ERP applications within a supply chain management framework.
Summary
Recent recorded grades — Spring 2019: 3.77 GPA, 90.9% A/AB (n=11 letter grades); Spring 2020: 3.78 GPA, 87.5% A/AB (n=16 letter grades); Spring 2022: 3.86 GPA, 100.0% A/AB (n=7 letter grades).
What you’ll be able to do
Recognize how inventory planning and replenishment, materials requirements planning, sales & operations planning, master scheduling, capacity resource planning and management, and scheduling execution activities work within a Supply Chain Management framework.
Apply world class ERP software (SAP) to conduct Supply Chain Management.
Identify the dynamics of Enterprise Resource Planning (ERP) systems that interface within a Supply Chain Management (SCM) framework.
Explain MA5 ERP implementation methodology (visioning, planning, design, construction and delivery).
Explain how to integrate various methodologies for replenishment planning.
Analyze complex operations projects as a means to understand the strategic thinking framework for Supply Chain Management (SCM).
Demonstrate how real Supply Chain Management is variable.
Source: UW Guide
Grade history
↗All recorded terms · compare terms & instructors
Prerequisites
Course mapProfessors
Spring 2027No instructors recorded for this selection.
Historical instructors & teaching patterns
Recorded history may be incomplete and does not establish a future schedule.
Calendar & sections
Spring 2027Schedule loads here as you scroll.
| Section | Mode | Enrolled / capacity | Waitlist |
|---|
Times are Central. Select a meeting for details; export includes recorded dates for the selected sections.
Meeting source records
No records available.
Student experience
the class
Recent recorded grades — Spring 2019: 3.77 GPA, 90.9% A/AB (n=11 letter grades); Spring 2020: 3.78 GPA, 87.5% A/AB (n=16 letter grades); Spring 2022: 3.86 GPA, 100.0% A/AB (n=7 letter grades).
difficulty & workload
No workload feedback recorded.
Topics
- Manufacturing Resource Planning Systems
- Cellular manufacturing systems
- Enterprise Resource Planning (ERP) systems in SCM
- Costing issues in planning and control
Skills
- Aggregate planning, material requirements planning, capacity planning, and operations scheduling
- Applying ERP software (SAP) for supply chain management
- MA5 ERP implementation methodology
- Cellular manufacturing procedures and costing issues
Grades
Latest available · Spring 2022— not enough history to project Spring 2027.
Grade distribution · % of letter grades
Grades over time
Through Spring 2022
More grade details Grade mix, volume & source data
Not enough comparable courses for Spring 2027 in UW–Madison.
Sources & history
Catalog & offerings
Descriptions, prerequisites, and recorded course offerings.
Catalog observation history
Observations at scan time; dates do not imply when a catalog change took effect.
Selected offering source records
No offering records for the selected term.
Raw records
[]
Student reviews
Original comments behind the course and instructor summaries.
Read original reviews
No records available.
Grade history
Recorded grade distributions by term, section, and instructor.
Explore recorded gradesRecorded 2026-10-14
Model outputs & technical records
LLM outputs across runs
Full model traces
Recorded model configuration, reasoning, and tool conversations.
Model & dataset provenance
{
"model": "Qwen/Qwen3.8-27B",
"model_revision": "1d4bf0f2ff6012fd82039f2fa52739d0dd7c60c0",
"task_version": "17",
"output_id": "330b451da6148900c589328325139ab6a19a68604af135e066d2f2e21989c786",
"requirements_status": "valid",
"dataset_revision": "fc1811fa52e581ea57a35c0cf3343f8740a8ffbf",
"observed_at": "2026-10-14 17:50:09.728220+00:00"
}